c/o Naomi Dowds, Coakley O Neill Town Planning Ltd., NSC Campus Mahon, Cork T12H7AA
Applicant Details
Proposed Development
Development Description:
Permission for development at Dublin Pike and Ballyhooly Road, Ballincrokig, Cork. The proposed development will consist of phase 1 of the Ballincrokig Masterplan which will involve the construction of 96 no. residential units (14 no. 4-bed semi-detached dwellings, 52 no. 3-bed semi-detached dwellings, 6 no. 3-bed townhouses, 6 no. 2-bed townhouses, 7 no. 2-bed apartments, 7 no. 2-bed duplex apartments, 2 no. 1-bed apartments and 2 no. 1-bed duplex apartments), 1 no. crèche, associated car parking, landscaping and amenity areas, foul and storm water drainage, including attenuation, and all associated site development works which include a temporary construction access from the Ballyhooly Road. Permanent access to the site is to be from the L2980 (Dublin Pike) Road through the Coppenger Fields development immediately adjacent to the west (and currently under construction).
Development Address:
Dublin Pike and Ballyhooly Road, Ballincrokig, Cork
Architect Name:
Location Key:
ANGLESEA STREET
Electoral Division:
Planner:
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
Waste Licence Required:
Protected Structure:
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
No
Comments:
Decision
Decision Date:
30/09/2021
Manager Order:
Decision Type:
Conditional
Number of Conditions:
44
Grant Date:
09/02/2023
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
Permission for development at Dublin Pike and Ballyhooly Road, Ballincrokig, Cork. The proposed development will consist of phase 1 of the Ballincrokig Masterplan which will involve the construction of 96 no. residential units (14 no. 4-bed semi-detached dwellings, 52 no. 3-bed semi-detached dwellings, 6 no. 3-bed townhouses, 6 no. 2-bed townhouses, 7 no. 2-bed apartments, 7 no. 2-bed duplex apartments, 2 no. 1-bed apartments and 2 no. 1-bed duplex apartments), 1 no. crèche, associated car parking, landscaping and amenity areas, foul and storm water drainage, including attenuation, and all associated site development works which include a temporary construction access from the Ballyhooly Road. Permanent access to the site is to be from the L2980 (Dublin Pike) Road through the Coppenger Fields development immediately adjacent to the west (and currently under construction).