10 year planning permission for a 20kV overground and underground grid connection cable of c.1.26km in length (of which c.0.43 km is located in the administrative area of Cork County and 0.83 km is located in the administrative area of Cork City) to be provided on overhead poles and in excavated trenches and include associated underground ducting, joint bay and all associated site development and reinstatement works. The proposed grid connection cable will connect the solar farm substation permitted under Cork County Council planning reference 18/7410 (An Bord Pleanála reference 304045-19) which is now located within the administrative area of Cork City with the existing 110kV Coolroe substation. The works will be carried out within the solar farm boundary, on private lands and within the public road. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
The
Development Address:
Garravagh, Inniscarra, Cork
Architect Name:
Location Key:
ANGLESEA STREET
Electoral Division:
Planner:
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
Waste Licence Required:
Protected Structure:
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
No
Comments:
Decision
Decision Date:
12/08/2021
Manager Order:
Decision Type:
Conditional
Number of Conditions:
18
Grant Date:
10/03/2022
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
10 year planning permission for a 20kV overground and underground grid connection cable of c.1.26km in length (of which c.0.43 km is located in the administrative area of Cork County and 0.83 km is located in the administrative area of Cork City) to be provided on overhead poles and in excavated trenches and include associated underground ducting, joint bay and all associated site development and reinstatement works. The proposed grid connection cable will connect the solar farm substation permitted under Cork County Council planning reference 18/7410 (An Bord Pleanála reference 304045-19) which is now located within the administrative area of Cork City with the existing 110kV Coolroe substation. The works will be carried out within the solar farm boundary, on private lands and within the public road. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.